HERE Bristol 93kWp Solar Installation
To help address the significant energy costs of the HERE building and to support the client's strong environmental, social and governance (ESG) approach, NSI Energy were asked to design a high performing solar system for the building's flat roof.
Huboo Solar Installation
As a company committed to sustainability and reducing its carbon footprint, Huboo recognised the need to transition to renewable energy sources. The challenge for NSI Energy was to implement a cost-effective, efficient solar energy solution that could power their fulfilment centres while supporting their environmental goals.
Blockleys Brickworks 632 kWp Solar Installation
NSI Energy provided a turnkey solar solution, meticulously engineered to meet the specific requirements of Blockleys brickworks. With a focus on maximising on-site generation, the generated solar power will be utilised exclusively within the facility, contributing to operational efficiency and sustainability goals.
John Scott Works Solar Installation
NSI Projects provided a turnkey package to JSW from applying for the grid connection agreement on their behalf through to testing and commissioning of the completed system. We provided full designs, modelled different scenarios and helped the client choose a 98kWp solar system.